Assembly

Afritainer units arrive pre-fabricated and flat-packed. This means that they are almost ready-to-be-used once delivered. The panels literally just have to be folded open and assembled together. Everything else (fittings and fixtures) are already included inside the box.

The units can be assembled in less than an hour and completely fitted / finished in less than one day. We offer DIY instructions to clients, but our team of experts can also take care of the assembly with the delivery on site.

No major construction work is required. No foundation is needed. The unit can rest on four level corner blocks of concrete, which can be poured by the client self.

The units come with electrical and plumbing outlets. However, all external supplies are excluded. Electricity and water to the units, as well as sewerage from the units need to be supplied. Geysers are not included in the standard units, but can be ordered separately.

Assembly

Requirements

Name

Lorem ipsum dolor sit amet shetur etpet respric allure throne fleop.

Name

Lorem ipsum dolor sit amet shetur etpet respric allure throne fleop.

Name

Lorem ipsum dolor sit amet shetur etpet respric allure throne fleop.

Name

Lorem ipsum dolor sit amet shetur etpet respric allure throne fleop.

Frequently asked questions

How long will it take to assemble a unit?

Units arrive flat-packed in a box, the size of a shipping container. The panels are literally folded open to assemble. It can be done in well under an hour.

Can I assemble the unit myself?

We offer thorough DIY instructions. However, our team of experts can quickly assemble the unit upon delivery so you don't have to.

Is a foundation required?

It’s ideal that the units do not stand directly on the ground, as it will lessen the lifespan of the units. However, a solid foundation is not required. Level blocks on the corners will suffice.

What are the level corner blocks?

A concrete block of 30 cm by 30 cm (15 cm deep) on each of the four corners of the unit will serve as a sufficient base for the unit. The blocks need to be level, to ensure that the unit stands level.

How can we help?

We’re sure you’ll have some questions. But, we’re also sure that we’ll be able to help you with the answers. Our service offering is so wide, that we can customise a solution to suit your needs.

Interested In

Single Room Open Plan (SU101)

Double Room (SU102)

Single Room with Bathroom (SU103)

Double Room with Bathroom (SU104)

Double Room with Bathroom (SU105)

Seperate Male / Female Toilets (SU106)

Male Toilets (SU107)

Unisex Toilets & Showers (SU108)

Male Urinals & Showers (SU109)

Double Size Office / Classroom (SU110)

Double Size Two Bedroom House (SU111)

Double Size Two Bedroom, Two Bathroom House (SU112)

Double Size Office / Classroom Unit with Seperate Room & Toilet (SU113)

Double Size Office / Classroom Unit with Seperate Room (SU114)

Double Size Office / Classroom Unit (SU115)

Quadruple Size Office / Classroom Unit (SU116)

Other